Spanish Fork City Panoramic View
Building Inspection

Public Works
spacer
Building Inspection
-Fees
-Permits
-Inspections
-Contact Information
spacer
Engineering
spacer
Utilities
spacer
Maps / GIS
spacer

Building Inspections

Types of Inspections

  • Footings / Setbacks (After formed, horizontal steel is suspended, and before concrete is scheduled)
  • Foundation (After formed, steel in place, before concrete is scheduled)
  • Structured Masonry / Bond Beam
  • Water Lateral (1" minimum size/ 36" minimum depth) * No inspection required *
  • Sewer Lateral (4" cast iron combo required for cleanout)
  • Underslab Plumbing (After pressure is on drain lines)
  • Underground Power Trench (Before backfilling/18" min.)
  • Temporary Power (Run in existing conduit)
  • Shear Panels / Tie Downs
  • Rough Plumbing (After lines are under pressure)
  • Rough Electrical (Before sheetrocking or insulated)
  • Rough Heating (Before sheetrocking or insulated)
  • Framing
  • Gas Line Pressure Test
  • Ceiling Grid
  • Stucco / Lath / Flashing
  • Drywall (Fire seperation walls before taping)
  • Permanent Power
  • Insulation (Before sheetrock)
  • Final
  • Curb & Gutter, Sidewalk Driveways & Streets (Must be approved to receive refund of deposit)

To schedule a building inspection call 801-804-4540. 24 hour notice is required.

To schedule a public works inspection call the engineering department at 801-804-4550.

NOTE: If your inspection is not on this list try engineering inspections.

Facebook |  Twitter |  RSS Feed |  Policy & Disclaimer | Copyright @ 2000-2010
Spanish Fork City Logo Spanish Fork City Logo